I've made the arrangements to have the ductless air conditioning system installed at the house. It's going to be around an 8-hour job, so that's pretty much most of the day for the installation. I thought I was going to have to wait for a week or two, given what the Installation Manager had told me late last week, but it turns out a slot opened up on Wednesday.
Much faster than I expected, but good news.
In bad news, the office air conditioning systems are still not working, and Maintenance is doing some "evaluating of the situation" (whatever that means), so it's hot as Hades here, even with the fans. I hate it when the sweat drips in my eyes (I don't have much hair up top to absorb the stuff, you see). :(